Compare builder quotes on scope, not on the headline price

Two quotes for the same job are rarely for the same job. Put them on the same footing first — inclusions, exclusions, VAT, specification, payment terms — and the comparison becomes straightforward.

Scoring sheets built for side-by-side comparison — £9.99 · Short printable checklist pack, no cost

At a glance

What this helps with
Putting two to four builder quotes on the same footing so a price comparison actually means something.
Best for
UK homeowners holding several quotes for the same extension, renovation or external works project.
What you get
  • • A scope-first comparison framework
  • • How to normalise inclusions and exclusions
  • • Where VAT quietly distorts a comparison
  • • Specification and materials questions
  • • A scorecard structure you can fill in yourself
Important disclaimer
The Builder's Brief UK provides practical homeowner guidance only. It is not legal, financial, architectural, structural engineering, planning or building-control advice. Always use suitably qualified professionals where required.

Normalise the quotes before you compare them

Write the same list of work stages down the page, then fill in what each builder has priced. Blanks are the finding.

  • Same scope list for every quote, in your words
  • Mark each item as included, excluded, an allowance, or not mentioned
  • Restate every price on the same VAT basis
  • Convert labour-only lines into a comparable total by adding your supply costs
  • Note provisional sums separately — they are not fixed money

A simple comparison framework

Score each quote against these headings yourself. There is no league table here and no data about individual builders.

  • Scope completeness: how much of your list is described
  • Clarity: can you tell what you are buying without asking?
  • Specification: are materials and finishes named or left open?
  • VAT and totals: is the real all-in figure clear?
  • Payment terms: stage-linked and proportionate?
  • Programme: realistic start window and duration
  • Assurance: insurance, references, relevant experience and recent similar work
  • Communication: how questions were answered during the quoting process

Where comparisons usually go wrong

  • Comparing a VAT-inclusive price with a VAT-exclusive one
  • Treating a provisional sum as a fixed price
  • Ignoring that one quote includes the kitchen and another does not
  • Choosing the lowest figure that happens to describe the least work
  • Assuming an earlier start date is worth more than a clearer scope

Questions worth asking all builders

  • What is excluded from this price?
  • Which figures are allowances rather than fixed?
  • Is VAT included, and how will it appear on invoices?
  • How are changes priced once work has started?
  • What insurance do you carry for work of this type?
  • Can I see a recent project of a similar type?

How to run the comparison

  1. 1. Write your own scope list

    One row per stage of work, in your words, before you look at any quote.

  2. 2. Map each quote onto your list

    Included, excluded, allowance or silent. Do not fill gaps with assumptions.

  3. 3. Put all prices on one VAT basis

    Then add your own supply costs where a quote is labour only.

  4. 4. Ask the same questions to everyone

    Send identical questions so the answers are comparable too.

  5. 5. Score, then decide

    Weigh scope completeness and clarity alongside price rather than after it.

Next step

Scoring sheets built for side-by-side comparison — £9.99

Compare quotes with the Quote Checker Pack

Start with the free Builder Quote Checklist

Common questions

How many builder quotes should I get?

Two to four is usually enough to see a pattern without stalling the project. Beyond that the comparison gets harder to keep consistent.

Why are my builder quotes so different?

Usually because they are pricing different jobs: different structural assumptions, different inclusions, different specification levels, different VAT positions, or allowances where another builder priced firm.

Should I always pick the cheapest quote?

Not automatically. The cheapest quote is sometimes the one describing the least work. Compare what is included before comparing the totals.

How do I compare a labour-only quote with a full supply-and-fit quote?

Add your own realistic material and supply costs to the labour-only figure so both quotes represent the same finished job.

Can you tell me which builder to choose?

No. This is practical homeowner guidance only, not legal, financial, architectural, structural engineering, planning or building-control advice, and it holds no information about individual builders.